ADNOC project · with Petrofac · Bu Hasa pipeline · MTO module
10–20% scope gaps found before pricing was locked
On a critical pipeline, the material takeoff surfaced the scope the documents had missed — before the price was fixed, not after the contract was signed.
Sector
Oil & gas
Module
MTO · material takeoff
Scope gaps found
10–20%
Forecast savings
$5M+
The challenge
Pipeline tenders hide quantity in long sections, crossing details and schedules that rarely agree with each other.
Missed scope shows up as contingency inflation in the bid — or as a loss on site.
What PROPX did
The MTO module measured every pipe length, fitting and trench from the drawings and cross-checked them against the specifications and schedules.
Differences and missing data were raised as gaps before pricing, so the team priced the real scope.
“On the critical Bu Hasa pipeline, PROPX's MTO module uncovered 10–20% scope gaps before pricing, reducing contingency buffers. This proactive clarity translates directly to over $5M in forecasted savings and immense financial confidence.”
More customer stories
Bid more. Win more. Grow revenue.
Send us a tender pack as issued. Get the bill of quantities back in one day — every line traced to its drawing.