One agent for the whole tender: drawings in, quantities out.

PROPX reads the tender pack, checks the drawings, rebuilds the project in 3D and measures the bill of quantities — then shows you the evidence for every line.

Pick a line. See what it counts.

A real pump station from a live tender. Choose a BoQ line — its elements light up, the rest of the model turns to glass.

From upload to sign-off, the same working day.

  1. 1

    Drop the whole tender pack

    Upload it as issued — PDF, DWG, scans, any size. No preparation needed.

    7,663 pages received · agents started
  2. 2

    Agents process it — the same day

    Every step is logged and reviewable, from the first sheet to the last line.

    Started 09:00 · BoQ the same working day
  3. 3

    One 3D model, every discipline

    Roads, utilities, structures and MEP in one shared model and one coordinate system.

    568 components · 17 disciplines
  4. 4

    BoQ line → 3D elements → quantity

    Pick any line and see the geometry it counts, isolated in 3D with its source evidence.

    Granular sub-base · 138,305 m² · +1.0% vs the client
  5. 5

    Every line traced to its drawing

    Method, source sheets and a clickable mask of exactly what was counted.

    1,935 BoQ items in one shared model
  6. 6

    Gaps go to your engineer

    When a drawing is missing, the agent measures what the documents define and flags the rest. You approve the assumption or ask the designer.

    Gap detected → assumption → approved by senior QS

Four modules, one tender workflow.

MTO · material takeoff

Auto-detects revisions and updates takeoffs instantly, so your estimates are always current.

  • No more manual counting
  • Every change is tracked
  • Always up-to-date data
Revision controlCESMM4Phase splits

QC/QA · drawing review

Detects coordination issues, code compliance problems and conflicts before they become costly rework — about 30 seconds a page.

  • Catches issues before they grow
  • Eliminates preventable delays
  • Keeps teams aligned from day one
CoordinationCode complianceFire safetyMissing infoOverlapsStructuralMEPAccessibility

Tender preparation

An automatic tender package and a preliminary BoQ, structured for your proposal and tendering teams.

  • QS recognition across packages
  • BoQ in the Employer's own template
  • Phase and package splits on every line
ExcelEmployer template

RFIs & risk map

Human-verified outputs. Export RFIs and the BoQ to PDF or Excel and prioritise issues with a risk map.

  • Assumptions are surfaced, never hidden
  • Differences against tender quantities flagged
  • RFIs ready to send
PDFExcelRisk map

What you get back.

Not a spreadsheet of guesses — a package your estimators, reviewers and the Employer can check line by line.

  • BoQ in your template

    The Employer's Excel, filled row by row, with phase columns and a status for every line.

  • Evidence report

    One card per line: quantities, splits, method, sources and a clickable mask.

  • 3D site model

    Browse the model in the browser; click an element to see the BoQ lines it feeds.

  • Discrepancy register

    Differences against the tender quantities, and the RFIs ready to send.

Why teams switch from manual takeoffs.

PROPXManual estimatingTakeoff software
Reads the tender pack as issued — PDF, DWG, scansYesBy handPartly
Time to price one tender1 day~22 daysDays to weeks
3D model across every disciplineYesNoNo
Measurement rules built in (CESMM4)YesBy handNo
Every quantity traced to its sheetYesRarelyPartly
Gaps and conflicts raised as RFIsYesBy handNo
Scales to every tender without hiringYesNoPartly
Engineer signs offYesYesBy hand

Works with what you already have.

In

PDFScansDWG / DXFRevitIFCExcel

Out

  • BoQ in your Excel template
  • Evidence report — one card per line
  • 3D model in the browser
  • Gap & RFI register

Integrates with Procore, Autodesk and other major construction software.

Roadmap. From quantities to the whole bid.

The same model and the same quantities will drive what comes after the BoQ.

  1. Available now

    Takeoff & BoQ

    Drawings → 3D model → measured bill of quantities with evidence.

  2. Coming next

    Procurement

    From the BoQ to purchase: material lists by package and phase, supplier RFQs and quote comparison.

  3. Coming next

    Pricing

    Rates applied to every BoQ line — a priced estimate from your own price base and market data.

  4. Coming next

    Planning

    Quantities tied to the schedule: production rates, crew loads and a construction timeline from the same model.

Bid more. Win more. Grow revenue.

Send us a tender pack as issued. Get the bill of quantities back in one day — every line traced to its drawing.