Solutions
Roads
Highways, interchanges, access roads and parking: the agent reads plans, long sections and cross-sections, rebuilds the corridor surface by surface and measures every layer.
What we measure
Pavement
- Granular sub-base and base course
- Binder and wearing courses
- Interlocking paving and footways
Edges & safety
- Kerbs and edgings
- RC barriers and steel guardrails
- Markings, studs and signs
Earthworks
- Cut and fill between real surfaces
- Topsoil strip and formation
- Phase and package splits
From drawing to quantity
1
Alignment & chainages
Plan geometry is tied to chainages, so every quantity has a location.
2
Profiles & sections
Levels and layer thicknesses come from long and cross sections, not assumptions.
3
Layer by layer
Each pavement layer is a separate 3D body, measured by area and volume.
BoQ lineUnitQty
Granular sub-basem²138,305
+1.0% vs the client's own quantity on a live tender
Measured on a real project
The full tender pack went in as issued. The same working day, the agents returned 1,935 BoQ lines in one shared 3D model — checked line by line against the client's own quantities.